SL NO | PROJECT NAME | NAME OF CLIENT | WORK DESCRIPTION | PERIOD / STATUS |
---|---|---|---|---|
1 | Southern Area Road maintenance project | Saudi Arabian Oil Company (ARAMCO) | Asphalting, road marking works and construction of concrete structures | Ongoing |
2 | MSG Pipeline Package -1 Civil Works for Area B | Saudi Arabian Oil Company (ARAMCO) | Excavation, backfilling, Berming and asphalting works, demolition and concrete works | Ongoing |
3 | Civil works in RSA Cell-3 | Ma’Aden Aluminum | Excavation, backfilling & asphalting works, Construction of Decant Sump, Under Drain Sump, Culverts with Covers and Sprinkler Foundation. | Ongoing |
4 | Parking Around Psychiatry Building | Johns Hopkins Aramco Health Care (JHAH) | Construction of parking space including Asphalting works, excavation, backfilling, Light pole relocation and concrete works. | 2019 |
5 | HDPE Piping Works for Ma'Aden | Ma'Aden Aluminum | HDPE Piping works for RSA Cell3 in Ma'Aden | Ongoing |
6 | CS Piping Works for Ma'Aden | Ma'Aden Aluminum | Installation of Metallic piping in RSA Cell3 in Ma'Aden | Ongoing |
7 | Electrical & Instrumentation Works In Ma'Aden | Ma'Aden Aluminum | Electrical and Instrumentation works including cable tray installation inside Ma'Aden Aluminum Plant | Ongoing |
8 | Electrical & Instrumentation Works In Contract 318-C01 Subdivision And Development Of Industrial Zone – Phase 1 | Royal Commission | MV & HV Cable installation, Termination and testing of cables, Installation of Panels, generators, Control Centers, Lighting fixtures, construction of duct banks, etc. | Ongoing |
9 | Telecommunication Works In Contract 318-C01 Subdivision And Development Of Industrial Zone – Phase 1 | Royal Commission | Installation, Splicing, termination and testing of FOC cables, Installation of IP Telephony system, Patch Panels and construction of duct banks, Etc | Ongoing |
10 | Construction of Pipeline Chambers with ancillary works | National Water Company (NWC) | Pipeline Chamber Works and Electrical Works in PSW, PSD & PST | 2018 - 2019 |
11 | UG Cabling Works for Re‐ Conductoring of 132kV DC OHTL between Al‐ Jouf PP and Sakaka | Saudi Electricity Company (SEC) | UG Cabling works including laying of 132kv HV cable along with FOC Cable and Excavation, backfilling, asphalting works, construction of Joint Bay, duct banks | 2019 |
12 | Offshore Parking Shade foundation work | Saudi Arabian Oil Company (ARAMCO) | Foundation Works for Offshore Parking Shade in Ras‐Tanurah | 2018 - 2019 |
13 | Wrapping of process line | Saudi Aramco Total Refining & Petrochemical Company (SATORP) | Wrapping of 36” process pipe line for liquid Naphthol in Jubail | 2018 |
14 | Wrapping Activities At Aindar GOSP‐4 | Saudi Arabian Oil Company (ARAMCO) | Repair of 8” Recycle line inside Aindar GOSP‐4. | 2018 |
15 | Repair Fuel Line Leak at KKAB | Saudi Arabian Oil Company (ARAMCO) | Repair of 8” Jet Air fuel line in King Khalid Air Base, Khamis Mushayat | 2018 |
16 | SFC ‐Wrapping activities at Aps‐ 8 & UA Plants | Saudi Arabian Oil Company (ARAMCO) | A+ Wrapping of various pipeline repairs in Abqaiq APS‐8 & UA Plants | 2018 |
17 | SFC ‐ Install Nonmetallic Wrapping Materials | Saudi Arabian Oil Company (ARAMCO) | Non‐Metallic A+ wrapping of 36” Crude Oil Pipeline in Khursaniyah. | 2018 |
18 | Connection of new Hail City SIS # 8926 with 132 kV Network in Hail | Saudi Electricity Company (SEC) | UG Cabling works including laying of 132kv HV cable along with FOC Cable and Excavation, backfilling, asphalting works, construction of Joint Bay, duct banks | 2017 ‐ 2018 |
19 | Electrical works in New Factory Building at Al-Kharj | Saudi Electricity Company (SEC) | MV & HV Cabling Works, Installation of panels, Cable tray installation, Grounding works and testing. | 2017 ‐ 2018 |
20 | Construction of Two 132 KV DC OHL for Al‐Badaya S/S 8851 in Qassim Area | Saudi Electricity Company (SEC) | UG Cabling works including laying of 132kv HV cable along with FOC Cable and Excavation, backfilling, asphalting works, construction of Joint Bay, duct banks | 2017 |
21 | Installation of 132 kV U/G Cable Circuits for S/S #8843 from BSP 9059 in Unaizah. | Saudi Electricity Company (SEC) | UG Cabling works including laying of 132kv HV cable along with FOC Cable and Excavation, backfilling, asphalting works, construction of Joint Bay, duct banks | 2016 ‐ 2018 |
22 | Installation of 132 KV U/G Cable circuits from S/S 8846 up to BSP SS9025, Al‐Russ | Saudi Electricity Company (SEC) | UG Cabling works including laying of 132kv HV cable along with FOC Cable and Excavation, backfilling, asphalting works, construction of Joint Bay, duct banks | 2016 |
23 | Construction & Installation of two Terminal Compounds at Al‐ Russ City | Saudi Electricity Company (SEC) | Civil works for the construction of terminal compounds for OH Power line. | 2016 |
24 | Construction & Installation of Terminal Compound at SS#8814, Al‐Assiyah, Qassim | Saudi Electricity Company (SEC) | Civil works for the construction of terminal compounds for OH Power line. | 2016 |
25 | Installation of 132 KV U/G Cable circuits for S/S 8845 in Buraydah, Qassim Area | Saudi Electricity Company (SEC) | UG Cabling works including laying of 132kv HV cable along with FOC Cable and Excavation, backfilling, asphalting works, construction of Joint Bay, duct banks | 2015 ‐ 2016 |
26 | Design, Supply, Installation & testing of Fire water line | Saudi Arabian Oil Company (ARAMCO) | Installation of Fire water line, fire water pumps, sprinklers in the facility | 2014 ‐ 2016 |
27 | Electrical Works for 56" EWG-2 Loop-2 & 56" KAEC Pipeline | Saudi Arabian Oil Company (ARAMCO) | Civil, electrical and infrastructure works for camp facilities | 2014 - 2015 |
28 | Fire Alarm System for 56" EWG‐2 Loop‐2 & 56" KAEC Pipeline | Saudi Arabian Oil Company (ARAMCO) | Electrical works including Fire alarm control panel installations, installation of smoke detectors, and generators | 2014 ‐ 2015 |
29 | Infrastructure facilities (Utility, Electrical, flood lighting, Civil, Fire Alarm, Fire Water, Installation of 500kva Generator sets) etc. | Saudi Arabian Oil Company (ARAMCO) | Installation of Generators, FACP systems, Plumbing works, Installation and terminations of Generators, lightings and Installation of Fencing | 2014 ‐ 2015 |
30 | Precast of Valves Chambers for the Pipeline Project | Ma’Aden Gold | Installation of ARV, WOV, and IV Chambers, precast of Valves Chambers for the Pipeline | 2012 ‐ 2013 |